HESCO New Connection Charges – Complete Fee List 2026
Hesco new connection charges are something every homeowner, shopkeeper, and factory owner in Hyderabad, Mirpurkhas, Sukkur, or Nawabshah needs to understand before getting electricity.
Why would someone need a new connection? Many reasons. You built a new house. You opened a small shop. You started a factory. Or you are a landlord adding a separate meter for a tenant.
The problem is that most people do not know the real cost until they get a surprise bill. Hidden fees. Unexpected charges. No clear information online.
This guide solves that. Here is a complete breakdown of hesco new connection charges for 2026.
One important thing to know. The fees change depending on what kind of connection you need. Domestic for homes. Commercial for shops and offices. Industrial for factories. Each has different rates.
Once your connection is active, you can perform a HESCO online bill check using your 14-digit reference number to see your current payable amount.
About the author: I worked as a billing officer at HESCO for over fifteen years. I have processed thousands of new connections. Everything written here comes from real experience in Sindh’s power sector.
What Are HESCO New Connection Charges? (Complete Breakdown 2026)

Let me break down every single fee so nothing surprises you later.
To avoid surprises at the end of the month, I recommend using this specialized HESCO bill calculator to estimate your total charges including taxes based on your current units.
Security Deposit
Think of this as insurance for HESCO. They keep this money in case you do not pay your bills later. The good news? You get it back when you close your connection.
The amount depends on your connected load. That means how much electricity you plan to use.
For a normal home, expect to pay between 2,000 and 5,000 PKR.
For a shop or small office, it goes up to 5,000 to 15,000 PKR.
For a factory, you are looking at 20,000 PKR or more.
Meter Charges
You need a meter to measure your electricity use. HESCO provides it. You pay for it.
A single phase meter costs between 3,000 and 4,500 PKR. This is what most homes use.
A three phase meter costs 6,000 to 9,000 PKR. Shops and factories usually need this.
The price includes the meter box and the seals that keep it safe.
Service Connection Fee
This covers the labor. HESCO sends workers to connect your wiring to their pole.
For a home, expect 500 to 1,500 PKR.
For a commercial or industrial connection, the price goes up. It depends on how far your building is from the nearest pole.
GST & Other Taxes
The government adds its share. GST is 17 to 18 percent on the total fees.
If you are a commercial user, there is also withholding tax. Homes do not pay this.
Step-by-Step Guide – How to Apply for a New HESCO Connection
Getting a new connection is not hard if you follow these steps.
If you are building a new home or office, you can easily navigate the Electricity New Connection (ENC System) to get your meter installed without visiting the office multiple times.
Step 1 – Gather Required Documents
Before you go anywhere, collect these papers.
A copy of your CNIC. If you are a tenant, also get the owner’s CNIC.
Proof that you own the property. This could be a property tax receipt, an allotment letter from a housing society, or a sale deed.
If you are renting, bring your rent agreement.
Two passport size photos.
If you are replacing an old connection, bring the previous electricity bill.
Step 2 – Visit HESCO Customer Service Center or Apply Online
You have two choices here.
The modern way is hesco new connection online apply. Go to hesco.gov.pk. Click on “New Connection.” Fill out the form. Upload your documents.
The old way works too. Visit your nearest SDO office. That stands for Sub Divisional Officer. Submit your papers there.
Either way, you pay an application fee of about 500 PKR.
Step 3 – Site Inspection by HESCO Team
After you apply, HESCO sends someone to your property. A lineman or an engineer.
They check how far your building is from the nearest electricity pole. They see if a new pole or transformer is needed. They calculate what materials will be required.
This usually happens within one week of your application.
Step 4 – Receive Demand Notice
This is an important document. HESCO issues a formal demand notice.
The notice lists every single hesco new connection charges you must pay. Security deposit. Meter cost. Service fee. Taxes. Everything.
There is also a small processing fee called hesco meter demand notice fee. This is usually 100 to 200 PKR.
Step 5 – Pay the Fees
Take your demand notice to any HESCO designated bank. HBL, UBL, National Bank, or others.
Or pay online through the HESCO portal, Easypaisa, or JazzCash.
Whatever method you choose, keep the receipt. That is your proof.
Step 6 – Meter Installation
After payment, HESCO schedules your installation. This takes 7 to 15 days.
A technician comes to your property. He installs the meter. He connects your internal wiring.
On that day, the first hesco meter reading is taken. That becomes your starting point for future bills.
If your bills are higher than expected, check which appliances are drawing the most power with our electricity consumption calculator Pakistan.
HESCO Meter Replacement Charges (When You Need a New Meter)
Sometimes you already have a connection but the meter stops working. Here is what to do.
Reasons for Meter Replacement
Meters can fail in several ways.
The meter stops working completely. The numbers do not move.
The meter gives wrong readings. Your bill becomes very high or very low for no reason.
Physical damage. A fire, flood, or accident breaks the meter.
The meter gets stolen. Yes, this happens. People steal meters for copper parts.
HESCO Meter Replacement Charges 2026
If your meter needs replacing, you pay again.
For a single phase meter replacement, the cost is 3,000 to 4,500 PKR.
For a three phase meter replacement, it is 6,000 to 9,000 PKR.
There is also an extra labor fee of 500 to 1,000 PKR.
One special case. If your meter was stolen, you must file an FIR at your local police station first. HESCO will ask for a copy.
How to Request Meter Replacement
Visit your nearest HESCO office. Or use the hesco new connection online apply portal and select “Meter Replacement.”
Pay the hesco meter replacement charges. HESCO will replace your meter within seven days.
HESCO Meter Rent Fix Charges – What You Need to Know
You might see a small amount on your monthly bill called meter rent. Here is what that is.
What Is Meter Rent?
HESCO owns the meter on your wall. They let you use it. But every month, they charge a small fee for that.
This is separate from your electricity consumption charges. You pay meter rent even if you use zero units.
HESCO Meter Rent Fix Charges 2026
These are fixed amounts. They do not change based on how much electricity you use.
For a single phase meter, you pay 50 to 100 PKR per month.
For a three phase meter, you pay 150 to 300 PKR per month.
These are called hesco meter rent fix charges. They cover meter maintenance and eventual replacement.
Can You Avoid Meter Rent?
No. Every HESCO customer pays meter rent. It is mandatory. There is no way around it.
Switching to green energy can wipe out your monthly dues; find out exactly how many plates you need by using this solar panel calculator Pakistan.
How to Check HESCO Meter Reading (For New Connections)
After your meter is installed, you should know how to read it.
Manual Meter Reading
Look at your meter. There are two common types.
A digital meter has an LCD screen. The numbers show up clearly.
An analog meter has dials like a clock. Read them from left to right. If a dial is between two numbers, take the smaller one.
Online Meter Reading Check
You do not have to go outside to see your reading.
Visit hesco.gov.pk or the MIS portal. Enter your 14-digit reference number. Your current hesco meter reading appears right there along with your bill.
What to Do If Meter Reading Is Wrong
If you think your meter reading is incorrect, take a photo. Show the numbers clearly.
File a complaint online or call the helpline at 123.
You can also request a meter test. The first test is free.
HESCO Demand Notice Fee – Explained
Some people get confused about the demand notice fee. Let me clear that up.
What Is a Demand Notice?
A demand notice is an official document from HESCO. Think of it as a formal price list for your new connection.
It lists every charge you must pay. Security deposit. Meter cost. Service fee. Taxes.
Without paying this notice, you will never get a meter installed.
How Much Is the HESCO Demand Notice Fee?
The hesco meter demand notice fee is the charge for issuing this document.
It is usually 100 to 200 PKR. Just a small processing fee. Separate from your security deposit or meter cost.
How to Get Your Demand Notice
After the site inspection, HESCO issues your demand notice.
You can collect it from the SDO office in person.
Or if you applied through hesco new connection online apply, you can download it directly from the portal.
HESCO New Connection Online Apply – Step-by-Step (2026)
Applying online saves time. Here is exactly how to do it.
Why Apply Online?
No need to visit the office multiple times. You can track your application from home. You can download your demand notice without going anywhere. Processing is usually faster.
Step-by-Step Online Application Process
- Step 1: Open your browser and go to hesco.gov.pk.
- Step 2: Click on “New Connection” or “Online Services.”
- Step 3: Fill out the form. You will need your name, CNIC, address, and how much load you require.
- Step 4: Upload scanned copies of your CNIC and ownership proof.
- Step 5: Pay the application fee online. Easypaisa, JazzCash, or a bank card all work.
- Step 6: Submit the form. You will receive an application number. Save it.
- Step 7: HESCO will contact you for a site inspection within 3 to 5 days.
How to Check Application Status
Log in to the HESCO online portal. Enter your application number.
The status will show where things stand.
Received means they got your application. Under Review means someone is looking at it. Inspection Scheduled means a date is set. Demand Notice Issued means your fee list is ready. Paid means you have submitted the money. Meter Installed means you are done.
HESCO New Connection Charges for Different Connection Types
Here is a quick reference table. Use it to estimate your total cost.
| Connection Type | Security Deposit | Meter Cost | Service Fee | Total (approx) |
|---|---|---|---|---|
| Domestic (Single Phase) | 2,000 – 3,000 | 3,000 – 4,000 | 500 – 1,000 | 5,500 – 8,000 |
| Domestic (Three Phase) | 5,000 – 8,000 | 6,000 – 8,000 | 1,000 – 1,500 | 12,000 – 17,500 |
| Commercial (Single Phase) | 5,000 – 10,000 | 3,000 – 4,500 | 1,000 – 2,000 | 9,000 – 16,500 |
| Commercial (Three Phase) | 10,000 – 20,000 | 6,000 – 9,000 | 2,000 – 3,000 | 18,000 – 32,000 |
| Industrial (Small) | 20,000 – 50,000 | 9,000 – 15,000 | 5,000 – 10,000 | 34,000 – 75,000 |
Remember, these are estimates. Your actual cost may vary slightly.
HESCO vs LESCO – New Connection Comparison
If you are moving between cities, you might need to know about LESCO too.
LESCO New Connection Process
LESCO serves Lahore. Their process is very similar to HESCO.
You need the same documents. CNIC, ownership proof, and if you are a tenant, a NOC from your landlord.
Online application is available at lesco.gov.pk.
How to Check LESCO New Connection Status
If you have applied for a connection in Lahore, you can track it.
Visit lesco.gov.pk. Go to New Connection. Click on Track Application. Enter your CNIC or application number. The status appears on your screen.
Fee Comparison – HESCO vs LESCO
Which company is cheaper?
For domestic connections, HESCO charges slightly less than LESCO.
For commercial connections, LESCO’s security deposit is higher.
Both companies charge similar hesco meter rent fix charges and meter replacement fees.
Why HESCO Users Search for LESCO
People move. A job transfer takes you from Hyderabad to Lahore. A student moves for university. A family relocates.
Sometimes people keep connections in both cities. A shop in Hyderabad and a home in Lahore.
So knowing how to apply lesco new connection and how to check lesco new connection status is useful for anyone who might move.
Common Problems & Fixes for HESCO New Connection
Application Rejected
Your application came back. Do not panic. Should you face any technical faults or billing errors, the fastest way to get a resolution is to file a HESCO complaint online and track its status digitally.
The most common reason is missing or incorrect documents. Check that your CNIC is valid and matches your ownership proof. Then reapply with the correct papers.
Demand Notice Not Issued
You applied weeks ago. Still no demand notice.
This usually means a delay in site inspection. Call your SDO office. Or use the hesco new connection online apply portal to follow up.
Meter Not Installed After Payment
You paid all the fees. But no one has come to install the meter.
Visit the HESCO office in person. Bring your payment receipt. Ask them to give you a written installation date.
Meter Reading Shows Zero After Installation
The technician left. Your meter says zero.
This is normal for the first day. Wait 24 hours. If it still shows zero, file a complaint.
Tips to Save Money on HESCO New Connection Charges
Apply during off-peak months. January to March is best. Fewer people apply, so processing is faster and sometimes cheaper.
Choose the right connection type. If your home needs less than 5 kilowatts, stick with single phase. Three phase costs more.
If you are renting a property, ask the owner to share the security deposit cost. It is fair because they get the money back when you leave.
Pay all fees on time. Late payments can mean penalties or having to reapply.
Keep copies of every document and every receipt. You will need them if something goes wrong later
Frequently Asked Questions
Official HESCO Contacts for New Connection Queries
| Purpose | Contact |
|---|---|
| New Connection Helpline | 022-111-111-123 |
| Online Application Support | hesco.gov.pk |
| SDO Office (Hyderabad) | 022-9200056 |
| Complaint for Delay | 123 (landline) |
| complaint@hesco.gov.pk |
Save these numbers. You may need them.
Conclusion – Get Your HESCO New Connection Without Stress
Applying for a new electricity connection does not have to be confusing.
Now you know every single hesco new connection charges. From the security deposit to the hesco meter rent fix charges. From the meter cost to the hesco meter demand notice fee.
You also know how to apply lesco new connection if you are moving to Lahore. And how to check lesco new connection status online.
Use hesco new connection online apply to save time. Keep your documents ready. Pay your fees on time. Soon you will have a working meter.
Save this guide. Share it with anyone who is building a new home or opening a new shop.
This guide has been verified against HESCO’s 2026 fee structure and application procedures. All charges are estimates. Contact HESCO for exact fees for your specific connection type.
