MEPCO Demand Notice 2026: Online Tracking, Fee & Payment Guide
Your complete guide to the MEPCO Demand Notice – from online tracking and payment to final confirmation.
Applying for a new electricity connection in Multan or its surrounding areas can feel like a maze. The most critical document you will encounter is the MEPCO demand notice. This paper is basically your green light to move forward.
In this 2026 guide, I will explain everything from checking your status to making the final payment. Let’s get your power connected without the headache. For those who want to understand the company better, here is an explainer: What MEPCO Stands For
What is MEPCO Demand Notice?

If you are wondering what is mepco demand notice, it is simply an official estimate or bill issued by the company. It lists the costs you must pay for a new electricity connection.
Think of the wapda demand notice as a formal verification that your application is approved. But why demand notice issued in the first place? It is to cover the expenses of the meter, wires, and the labor required to bring electricity to your doorstep. You will usually receive this document after your site is inspected and your papers are verified.
Types of MEPCO Demand Notice
The cost and requirements change based on how you plan to use the electricity.
- Demand notice for domestic connection: This is for houses and apartments. It is the most common type and generally has the lowest rates.
- Demand notice for commercial connection: If you are opening a shop, office, or mall, you will fall into this category.
- Demand notice for industrial connection: This is for factories and heavy machinery setups. It requires a more detailed technical survey.
Demand Notice Process (Step-by-Step)
Getting your power turned on is a journey. Think of it like getting approval before installing electricity at home.
Step 1 – Apply for New Connection
Everything starts with your application. You can submit this through the demand notice process portal online. Before applying for a new connection, you can estimate your future costs using the MEPCO Bill Calculator.
Step 2 – Document Verification
MEPCO officials will check your property papers and ID. This is one of the vital MEPCO demand notice steps to ensure everything is legal.
Step 3 – Demand Notice Issued
Once the technical survey is done, the electricity new connection demand notice is generated. This shows the total amount you owe.
Step 4 – Payment Submission
You take the notice to a bank and pay the required fee.
Step 5 – Meter Installation
After payment, the team arrives to install your new meter. Once your meter is installed, you will need to check your consumption regularly. Learn how here: Check MEPCO Online Bill.
Demand Notice Tracking (All Methods)
Waiting for your notice can be stressful. Thankfully, demand notice tracking is quite modern now.
Track by CNIC
If you don’t have your application number, you can do demand notice tracking by cnic. Just enter your 13-digit ID card number on the tracking page.
Track by Reference Number
Every application gets a unique ID. Using demand notice tracking by reference number is usually the fastest way to get an update.
ENC System Tracking
The most reliable platform is the enc demand notice tracking portal. It gives real-time updates on where your application stands. You can also track demand notice online using this specific government portal.
If you want to follow your application from start to finish, use the MEPCO New Connection Tracking Online tool.
How to Check MEPCO Demand Notice Online
The official method is straightforward. Open your browser. Go to the MEPCO website. Find the “New Connection” section. Click on “Demand Notice Status”.
mepco demand notice check online does not require any registration. Just input either your CNIC or application ID. The page refreshes with real-time data.
Status Meanings
- Pending: Your documents are still under review. No notice generated yet.
- Issued: The mepco demand notice status check will show a green flag. Your PDF is ready for download.
- Verified: Payment has been confirmed. Meter installation team has been notified.
how to check mepco demand notice status if the portal is down? Call the MEPCO helpline. Provide your reference number to a live agent.
How to Download & Print MEPCO Demand Notice
Once the status shows “Issued”, you need a hard copy for bank submission and personal records.
Download PDF Method
Click the download icon next to your notice. A PDF file saves to your device. This mepco demand notice download option works 24/7.
how to download mepco demand notice pdf on a mobile phone? The process is identical. Your phone’s browser will handle the PDF without any extra app.
Print Demand Notice
Open the downloaded file. Press Ctrl+P (or Cmd+P on Mac). Select your printer. Use black and white mode to save ink. The mepco demand notice print should be clear and legible. Banks may reject blurry copies.
how to print mepco demand notice at a shop? Transfer the PDF via USB or email. Any photocopy center can produce a clean print for a few rupees.
MEPCO Demand Notice Fee, Charges & Cost (2026)
The demand notice fee is not a fixed price for everyone. It depends on your specific setup.
| Charge Type | Description |
| Demand notice meter fee | The cost of the physical electricity meter. |
| Demand notice installation charges | Labor and wiring costs from the pole to your house. |
| Demand notice charges | Administrative and security deposits. |
For the current year, the demand notice fee 2026 has been adjusted for inflation. The total demand notice cost for new connection is determined by your distance from the nearest transformer and the load you requested. The final demand notice amount calculation is printed clearly on your document.
How to Pay Demand Notice
Once you have the paper, it’s time to settle the dues.
Bank Payment Method
The standard demand notice bank payment method involves visiting branches like NBP, HBL, or UBL. You simply hand over the notice and the cash at the counter.
Online Payment Options
Wondering how to pay demand notice from home? Some mobile apps now support the demand notice payment via 1Bill or specific utility payment sections. The demand notice payment procedure is usually instant, but keep your digital receipt safe.
After Payment – Next Process
Your job isn’t finished once you pay.
First, you might need to do a mepco demand notice upload receipt on the ENC portal to speed things up. The demand notice after payment process involves a final inspection by the wiring contractor.
Usually, the demand notice connection time after payment is between 7 to 15 days, depending on the availability of meters in your local subdivision.
Demand Notice Validity & Last Date
Every notice comes with a clock ticking.
The demand notice validity is typically 30 days. You must pay before the mepco demand notice last date printed on the top right corner. If it expires, you might have to go through the whole application process again.
MEPCO Demand Notice Requirements
To avoid delays, make sure you meet the demand notice requirements.
- Demand notice document details: You need a copy of your CNIC, property ownership proof (Registry), and a “No Objection Certificate” (NOC) if required.
- Witnesses: Sometimes, copies of neighbors’ bills are needed to verify the location.
Common Demand Notice Issues & Solutions
Sometimes things go wrong. Here is how to fix them.
- Demand notice not received: If it’s been over two weeks since your survey, visit your local XEN or SDO office.
- Demand notice delay reasons: Usually caused by missing documents or a shortage of meters in the warehouse.
- Demand notice issue solution: Always keep your application tracking ID handy when talking to officials.
- Demand notice correction: If your name or address is wrong, apply for a fix at the MEPCO customer center immediately.
Facing a technical issue after installation? Keep the MEPCO Complaint Number handy for quick resolution.
How Long Does Demand Notice Take?
Many people ask, how long does mepco demand notice take? Generally, from the day you apply to the day the notice is issued takes about 5 to 10 working days. After payment, the meter installation adds another week.
New Connection Demand Notice
The new connection demand notice is the most vital part of getting power. Whether it is a new meter demand notice for a separate portion of your house or a primary electricity demand notice, the rules remain the same. Ensure the load mentioned matches your appliances to avoid future fines. You might also see this referred to as a mepco enc demand notice on official sites.
Comparison
Demand Notice vs Connection Fee
The demand notice vs connection fee is a common point of confusion. The notice is the document that contains the connection fee plus other security charges.
If you are unsure how fuel price adjustments affect your monthly bills, read this detailed guide: How to Calculate FPA in Electricity Bill in Pakistan
Demand Notice vs Electricity Bill
In the battle of mepco demand notice vs electricity bill, remember that the notice is a one-time setup cost. The bill is what you pay every month for the units you consume.
MEPCO vs GEPCO Demand Notice
When comparing mepco vs gepco demand notice, the main difference is the jurisdiction. MEPCO serves South Punjab, while GEPCO serves the Gujranwala region. Prices may vary slightly based on local material costs.
Quick Summary
- Apply online at the ENC portal.
- Track your status using your CNIC.
- Download and print the PDF once issued.
- Pay at a bank before the expiry date.
- Wait for the team to install your meter.